<< Back to case studies    

CHEM-CRETE PAVIX CCC100,
THE C350 CROSSRAIL PUDDING MILL LANE PROJECT

   

The C350 Pudding Mill Lane project involved the construction of a new cut and cover tunnel to allow the installation of a Crossrail line. The cut and cover eastbound and westbound tunnel provides the transition between the tunnels running beneath central London and the over ground aspect of the line.

Chem-Crete PAVIX CCC 100 was used on the project to protect the concrete for the foreseeable future. Along with Epicuro Ekosorb PR-C, a sacrificial anti-graffit product compatible with Chem-Crete PavixCCC100 to protect areas where graffti might be an issue.

Chem-Crete PAVIX CCC100 is a unique water-based product for permanent protection of concrete structures and other porous substrates against temperature and moisture associated problems, such as damage caused by freeze-thaw cycles and chloride ion penetration.

It keeps treated concrete reasonably dry, thus eliminates all water and moisture related deterioration.

Chem-Crete PAVIX CCC100 is designed specially to protect highway bridges, car parks, buildings and costal structures

For more information about Chem-Crete PAVIX CCC100 please click here click here